Petone Sub-Station
KiwiRail required a new sub-station to be provided alongside an existing 1950’s building housing life-expired switch-gear. The sub-station transforms 11 kV power and converts to...
-
Log Processing Plant
Octa’s role was to provide a detailed construction programme and review this on an ongoing basis; monitor progress, chair construction meetings, develop the cost budget...
-
Te Aroha Beef Plant
Octa provided full project management during the rebuild of Te Aroha Beef Processing Plant after it was destroyed by fire in December 2010. Our involvement...
-
Tatua Dairy
Octa project managed the design, construction, installation and commissioning of a speciality dryer and packing facility at the Tatua Co-op Dairy on behalf of Tetra...
Industrial Projects
Ngatamariki Geo-thermal Power Station
Infrastructure, IndustrialOcta was asked to provide project management services for Mighty River Power’s new $475 million 82MW geothermal power station at...
Burwood Landfill Gas to QEII Park
IndustrialOcta was seconded into Christchurch City Council to project manage the design and construction of this energy project. Octa’s strategy...
Log Processing Plant
IndustrialOcta’s role was to provide a detailed construction programme and review this on an ongoing basis; monitor progress, chair construction...
Te Aroha Beef Plant
IndustrialOcta provided full project management during the rebuild of Te Aroha Beef Processing Plant after it was destroyed by fire...
Tatua Dairy
IndustrialOcta project managed the design, construction, installation and commissioning of a speciality dryer and packing facility at the Tatua Co-op...
Cottonsoft
IndustrialOcta was initially engaged by Cottonsoft to assist with all aspects of their planned new facility in Auckland through Octa’s...
Kawerau Power Station
IndustrialConstruction of Mighty River Power’s 90MW Kawerau geothermal power station commenced in January 2007. Octa’s role was to provide professional...
Petone Sub-Station
Infrastructure, IndustrialKiwiRail required a new sub-station to be provided alongside an existing 1950’s building housing life-expired switch-gear. The sub-station transforms 11...