• About
  • News
  • People
  • Projects
    • All
    • Commercial
    • Education
    • Residential
    • Infrastructure
    • Public
    • Industrial
    • Healthcare
    • Tourism
  • Services
    • Heritage
    • Design Management
    • Programme Management
    • Sustainability
    • Business Cases and Feasibility Studies
  • Regions
    • All
    • Auckland
    • Hamilton
    • Tauranga
    • Napier
    • New Plymouth
    • Nelson
    • Wellington
    • Christchurch
    • Dunedin
    • Queenstown
    • Brisbane
  • Māori
  • 繁體中文
  • 简体中文
  • Contact

Copyright © 2025 OCTA Associates Limited

Website by The Logic Studio & Walsh and Beck

Menu

Hornby High and Hornby Primary Schools

Education

  • Hornby 4
  • Hornby Gym 1

Hornby High and Hornby Primary Schools

Ministry of Education

Octa provided full project management services for the redevelopment of Hornby High and Hornby Primary Schools which share a common boundary. Hornby Primary’s redevelopment included relocation and refurbishment of existing buildings, site works and a new administration block.

Hornby High School has been almost completely rebuilt to include a whare, administration block, gymnasium, technology block and teaching spaces to replace the (1975) temporary buildings. 

The completion of Hornby High Separable Portion 1 in June 2018 saw new blocks officially opened and the gymnasium, technology and administration fully operational. Hornby High Separable Portion 2 includes construction of 3 new Homebase Buildings

When the High School project was completed, 90% of the School’s existing buildings had been demolished and replaced with 45 new classrooms and modern facilities.

  • Hornby High is the first MOE project to use a ground-source heating system (underfloor)

  • Staging the work was made more complex with the High School temporarily using a Primary School building

  • Both sites remained fully operational while construction was carried out

  • While the schools were developed under two separate contracts with two separate contractors, they were considered together in the design, staging and decanting processes.

Images supplied by Leighs Construction

View Next Project

Clayton Park School 3

View Next Project

Old St Pauls interior WEB v2
  • All
  • Commercial
  • Education
  • Residential
  • Infrastructure
  • Public
  • Industrial
  • Healthcare
  • Tourism