• About
  • News
  • People
  • Projects
    • All
    • Commercial
    • Education
    • Residential
    • Infrastructure
    • Public
    • Industrial
    • Healthcare
    • Tourism
  • Services
    • Heritage
    • Design Management
    • Programme Management
    • Sustainability
    • Business Cases and Feasibility Studies
  • Regions
    • All
    • Auckland
    • Hamilton
    • Tauranga
    • Napier
    • New Plymouth
    • Nelson
    • Wellington
    • Christchurch
    • Dunedin
    • Queenstown
    • Brisbane
  • Māori
  • 繁體中文
  • 简体中文
  • Contact

Copyright © 2025 OCTA Associates Limited

Website by The Logic Studio & Walsh and Beck

Menu

Emerson's Brewery Relocation

Industrial

Emerson's Brewery Relocation

Lion Breweries

$25M

A new location was needed for Emerson’s Brewery as demand was higher than the capacity available at the existing plant. Octa was engaged to monitor the construction works and safety KPIs. During this process, the existing plant was reused while introducing new plant and brew tanks. The project achieved business as usual during migration of the existing brewing and bottling equipment.

The overall scope included:

  • Construction works and Safety KPI monitoring

  • Chairing daily co-ordination meetings

  • Master Programme monitoring and review

  • Individual work package programmes

  • Manage and Control Migration works

  • Production reporting and forecasting

The new site currently produces 2.5 million litres of beer with an available capacity of up to 8 million litres, and has a 225 seat restaurant. The project was successfully delivered in 2016.

View Next Project

Maori Television

View Next Project

fonterra 1
  • All
  • Commercial
  • Education
  • Residential
  • Infrastructure
  • Public
  • Industrial
  • Healthcare
  • Tourism