Petone Sub-Station
KiwiRail required a new sub-station to be provided alongside an existing 1950’s building housing life-expired switch-gear. The sub-station transforms 11 kV power and converts to...
-
Maori Television Relocation
Maori TV, New Zealand’s indigenous broadcaster, established itself in Newmarket back in 2004 and developed organically over 12 years. After an extensive search, a new...
-
Parkbridge Apartments
Octa was engaged to project manage the repairs and re-build on this high-profile site at the corner of Bealey Ave and Park Terrace, opposite Hagley...
-
Central Library Establishment (Turanga)
Octa was involved in the initial phases of the project including Master Programming and Design Management prior to the Central Library project going out to...
-
Air New Zealand Lounges
Octa was involved from inception of the programme of works to redefine the Air New Zealand Lounges throughout Australasia, and to create world leading lounges....
Key Projects
Auckland Airport
CommercialThe domestic terminal was upgraded to increase capacity, including new security facilities and dual boarding provisions for greater aircraft turnaround...
8 on Nugent
Commercial, ResidentialOcta Associates managed the design and construction of the 8 on Nugent development which combines three adjoining buildings sited along...
Air New Zealand Lounges
CommercialOcta was involved from inception of the programme of works to redefine the Air New Zealand Lounges throughout Australasia, and...
Air New Zealand Christchurch
CommercialAs part of the Christchurch Airport development, Octa was engaged to project manage the design and construction of a new...
ASB North Wharf
CommercialNorth Wharf is a culmination of four years’ work led by Octa in the development of a new generation of...
Epsom Girls’ Grammar
EducationOcta was engaged in 2008 to develop a property master plan and 10 Year Property Plan for Epsom Girls' which...
Albion Square
PublicOcta Associates was seconded into the Christchurch City Council Project Management Unit. The Lyttelton/Mt Herbert Community Board, the local community and...
Annandale - award
ResidentialOcta provided Project Management of the planning design, construction and fit-out of six separate facilities, plus development and integration of...
Berkeley Dallard Apartments
ResidentialOcta was engaged in September 2012 for the role of Construction Project Management and Contract Administration Services for the Berkeley...
Carlton Hotel
CommercialThis multi-use development project consisting of a Bar, two Restaurants and Office space was one of the first to get...
Caroline Bay Aquatic Centre
PublicAs project manager, Octa assisted the Client to appoint the design team, and then manage the nine month process to...
Christchurch Ocean Outfall
InfrastructureWhen Octa managed this ocean outfall project in 2009, it was the biggest construction project the Council had undertaken. The...
Dunedin Chinese Garden
PublicOcta began by assisting the Dunedin City Council with the visioning and strategy for realising the dream of constructing an...
Cottonsoft
IndustrialOcta was initially engaged by Cottonsoft to assist with all aspects of their planned new facility in Auckland through Octa’s...
Counties Manukau Police HQ
PublicThe NZ Police identified the need to provide a new headquarters for the Counties Manukau East area, primarily arising from...
Dunedin Public Art Gallery
PublicOcta’s role included an Issues and Options Study, Community Consultation, Council Facilitation, Scope and Design, and Project Management. Following a period...
Dunedin Centre and Town Hall
PublicOcta was engaged by the Dunedin City Council to provide full project management services for the redevelopment of this significant...
Harman Courts Social Housing
ResidentialOcta was responsible for project managing the design and build of 18 new social housing units in Addington for the...
Heretaunga College
EducationOcta provided full project and programme management services for the redevelopment project, from Master Planning through to implementation and close...
Kahurangi School
EducationOcta provided full project management services from master planning through to implementation, close out and soft fit-out management on this...
New Plymouth Police HQ
PublicOcta provided full project management services including the procurement of the designers, QS and contractor, programming of the entire project,...
Napier Public Libraries Strategy
PublicA study of Napier Libraries services and facilities was conducted to identify the optimum use of both facilities. Octa undertook a...
Ngatamariki Geo-thermal Power Station
Infrastructure, IndustrialOcta was asked to provide project management services for Mighty River Power’s new $475 million 82MW geothermal power station at...
Rangi Ruru Girls' School
EducationOcta provided full project management services to Rangi Ruru Girls’ School to replace and repair quake-affected buildings. The Science Block...
Project Sovereign
CommercialOcta was involved from the onset in the development of the business plan, commercial terms and design development. This 12,500 sqm...
Tatua Dairy
IndustrialOcta project managed the design, construction, installation and commissioning of a speciality dryer and packing facility at the Tatua Co-op...
Te Aroha Beef Plant
IndustrialOcta provided full project management during the rebuild of Te Aroha Beef Processing Plant after it was destroyed by fire...
Te Puni Student Accommodation
Education, ResidentialOcta provided full project management and contract administration for the University and the Australian development managers. Te Puni Village is a...
Toitu Otago Settlers' Museum
PublicOcta was engaged as Project Director, Project Manager, Design Manager and Strategic Management Consultant for the redevelopment of the Settlers’...
Waitakere CC-Unitec
EducationOcta Associates was engaged to manage the project from concept through to occupation by Waitakere City Council (WCC) and Unitec....
Wellington Railway Station
Commercial, EducationOcta provided comprehensive project management services to integrate the design and construction to successfully deliver this project. The fit-out of approximately...
Burwood Landfill Gas to QEII Park
IndustrialOcta was seconded into Christchurch City Council to project manage the design and construction of this energy project. Octa’s strategy...
Napier Port Central Building
InfrastructureOcta was engaged to provide full project management and act as Engineer to the Contract, from feasibility study through to...
Wgtn Traction Overhead System Renewal
InfrastructureOcta was engaged as Engineer to the Contract by KiwiRail for this infrastructure replacement project. Octa’s engagement commenced mid-2013 and...
VUW Rutherford House
EducationA six-floor annexe on the Featherston Street side of the current building provides modern, fit-for-purpose teaching spaces, while extensions to...
Christchurch Town Hall Repair
PublicChristchurch Town Hall refurbishment and seismic remediation has now completed a three-year contract with official opening taking place on 23...
Port Otago Tug Procurements
InfrastructureOcta has been involved in three Port Otago Limited (POL) tugs, the “Otago” ($8.5M in 2003), “Taiaroa” ($11M in 2014,)...
Fonterra Stanhope, Victoria
IndustrialOcta’s involvement with the first new cheese factory to replace the original fire-damaged plant, began in November 2015. This was...
Log Processing Plant
IndustrialOcta’s role was to provide a detailed construction programme and review this on an ongoing basis; monitor progress, chair construction...
University of Otago Science Block
EducationOcta provided project management services to the University of Otago for the redevelopment of the University’s Science Building. Extensive refurbishment...
University of Canterbury Kirkwood Hall
EducationOcta project managed the refurbishing of an existing rest home (St Nicholas Hospital) into a 72 bed University Hall of...
Waitākiri and Rāwhiti Primary Schools
EducationOcta project managed the design and construction of these two new schools - Waitākiri ($14.5m) and Rāwhiti ($15.5m). Each school...
Stewart Island Accommodation
CommercialReal Journeys Ltd (RJL) is a large tourism operator in the south of New Zealand. The ferry service from Bluff...
Kawerau Power Station
IndustrialConstruction of Mighty River Power’s 90MW Kawerau geothermal power station commenced in January 2007. Octa’s role was to provide professional...
Freemans Bay School Redevelopment
EducationFreemans Bay School, located at 95 Wellington Street, Freemans Bay, Auckland, was redeveloped to address weather-tightness, roll growth, ground condition...
Maori Television Relocation
CommercialMaori TV, New Zealand’s indigenous broadcaster, established itself in Newmarket back in 2004 and developed organically over 12 years. After...
Emerson's Brewery
CommercialA new location was needed for Emerson’s Brewery as overall demand was higher than capacity of the existing plant. Octa...
Petone Sub-Station
Infrastructure, IndustrialKiwiRail required a new sub-station to be provided alongside an existing 1950’s building housing life-expired switch-gear. The sub-station transforms 11...
Parkbridge Apartments
ResidentialOcta was engaged to project manage the repairs and re-build on this high-profile site at the corner of Bealey Ave...
Clayton Park Primary School Redevelopment
EducationOriginally built in 1978 with flat roofs, the permanent buildings in the entire school had become degraded due to weathertight...
Air NZ Wgtn Domestic Lounge
CommercialConstruction commenced in December 2018 to upgrade Wellington’s passenger facilities to provide a new open plan kitchen and lounge. While...
Hornby High and Hornby Primary
Octa provided full project management services for the redevelopment of Hornby High and Hornby Primary Schools which share a common...
CHT Rest Home Redevelopments
ResidentialOcta assisted the Client to review the nine existing rest homes (including 5 hospital sites) and assess feasibility for modernisation. ...
Central Library Establishment (Turanga)
PublicOcta was involved in the initial phases of the project including Master Programming and Design Management prior to the Central...